PGE-INT-124950098
Live Oak · Sutter County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | NORTH STATE SOLAR ENERGY CONSTRUCTION | All their sites → |
| Installer | NORTH STATE SOLAR ENERGY CONSTRUCTION | All their sites → |
| Utility / operator | Solarenewal LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Mission Solar Energy LLC | MSE385SX5R | 194 | 384.5 W |
| inverter | Chilicon Power, LLC | CP-720-60/72/96-208/240-MC4 [208V][SI1-JUN20] | 97 | 0.72 kW |
Site risk
Severe-weather exposure
Solar sites in Sutter County have been matched to an average of 1.7 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (82 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 39.2925, -121.6710 · map
Record cadg_PGE-INT-124950098 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.