PGE-INT-124817053
Olivehurst · Yuba County · California · Commercial
System size
136.1 kW
133.1 kW AC
Installed
2023
2023-03-31
Price / watt
$2.59/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CHICO ELECTRIC | All their sites → |
| Installer | CHICO ELECTRIC | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SMA America | STP 33-US-41 [480V][SI1-JUN20] | 1 | 33.3 kW |
| inverter | Solectria Renewables | PVI 28TL-480 (480V) | 6 | — |
| inverter | SMA America | STP 33-US-41 [480V][SI1-JUN20] | 1 | 33.3 kW |
| inverter | Solectria Renewables | PVI 28TL-480 (480V) | 6 | — |
Site risk
Severe-weather exposure
Solar sites in Yuba County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (58 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-124817053 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.