PGE-INT-124809490
Alameda County · California · Commercial
System size
499.5 kW
499.5 kW AC
Installed
2025
2025-05-16
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Bloom Energy | All their sites → |
| Installer | Bloom Energy | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Bloom Energy | INV-750-0HA [480V] [SI1-JUN20] | 2 | — |
Record cadg_PGE-INT-124809490 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.