PanelCensus

PGE-INT-124804644

San Bruno · San Mateo County · California · Commercial

System size
263 kW
258.8 kW AC
Installed
2025
2025-01-23
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerPeninsula Clean EnergyAll their sites →
DeveloperINTERMOUNTAIN ELECTRIC COMPANYAll their sites →
InstallerINTERMOUNTAIN ELECTRIC COMPANYAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleMaxeon Solar Technologies Ltd.SPR-MAX3-425651424.9 W
inverterSolarEdge Technologies Ltd.SE100KUS [480V][SI1-JUN20]233.3 kW

Site risk

Severe-weather exposure

Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.

Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-124804644 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-124804644 — solar installation details