PanelCensus

PGE-INT-124770814

Huron · Fresno County · California · Utility-scale

System size
1,016 kW
996.6 kW AC
Installed
2025
2025-09-30
Price / watt
$1.87/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerCALCOM SOLARAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleFirst Solar, Inc.FS-6450A-P-x2,454450.2 W
inverterChint Power Systems AmericaCPS SCH100KTL-DO/US-480 [480V] [SI1-JUN20]9100 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 36.1974, -120.1382 · map

Record cadg_PGE-INT-124770814 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-124770814 — solar installation details | PanelCensus · PanelCensus