PGE-INT-124553624
South San Francisco · San Mateo County · California · Commercial
System size
48.1 kW
47.7 kW AC
Installed
2025
2025-11-14
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | SUNRUN INSTALLATION SERVICES INC | All their sites → |
| Developer | SUNRUN | All their sites → |
| Installer | Sunrun | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO BLK ML-G10+ 405 | 128 | 405 W |
| inverter | SolarEdge Technologies Ltd. | SE7600H-US [240V] [SI1-SB] | 1 | 7.62 kW |
| inverter | SolarEdge Technologies Ltd. | SE11400H-US [240V] [SI1-SB] | 3 | 11.39 kW |
Site risk
Severe-weather exposure
Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.
Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-124553624 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.