PanelCensus

PGE-INT-124488960

Chico · Butte County · California · Commercial

System size
138.4 kW
136.4 kW AC
Installed
2024
2024-04-25
Price / watt
$1.73/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperALTERNATIVE ENERGY SYSTEMS INCAll their sites →
InstallerALTERNATIVE ENERGY SYSTEMS INCAll their sites →
Utility / operatorSierra Nevada Brewing CoAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleBoviet Solar Technology Co., Ltd.BVM6612M-450S-H-HC-BF-DG328451.2 W
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20]260 kW

Site risk

Severe-weather exposure

Solar sites in Butte County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (209 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 39.7249, -121.8147 · map

Record cadg_PGE-INT-124488960 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-124488960 — solar installation details | PanelCensus · PanelCensus