PGE-INT-124358970
Rocklin · Placer County · California · Commercial
System size
111.7 kW
107.7 kW AC
Installed
2024
2024-02-16
Price / watt
$2.41/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Barnum & Celillo Electric, Inc. | All their sites → |
| Installer | Barnum & Celillo Electric, Inc. | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Maxeon Solar Technologies Ltd. | SPR-MAX6-460-COM | 258 | 459.6 W |
| inverter | Enphase Energy Inc. | IQ7PLUS-72-E-US [208V] [SI1-JUN20] | 258 | 0.29 kW |
Site risk
Severe-weather exposure
Solar sites in Placer County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (221 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-124358970 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.