PGE-INT-124317645
Santa Cruz · Santa Cruz County · California · Commercial
System size
82.1 kW
80.8 kW AC
Installed
2023
2023-03-25
Price / watt
$1.88/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | 1ST LIGHT ENERGY INC | All their sites → |
| Installer | 1ST LIGHT ENERGY INC | All their sites → |
| Utility / operator | University of California Santa Cruz | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | HYUNDAI ENERGY SOLUTIONS CO., LTD. | HiS-S390PI | 232 | 390.7 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 1 | 60 kW |
| inverter | Chint Power Systems America | CPS SCA25KTL-DO-R/US-480 [480V] [SI1-JUN20] | 1 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Santa Cruz County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (216 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-124317645 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.