PGE-INT-124311536
Corcoran · Kings County · California · Commercial
System size
76.1 kW
73.5 kW AC
Installed
2024
2024-05-21
Price / watt
$1.52/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | ENGIE SERVICES U.S. INC | All their sites → |
| Installer | ENGIE SERVICES U.S. INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS3W-455MB-AG | 180 | 455.1 W |
| inverter | Chint Power Systems America | CPS SCA25KTL-DO/US-208 [208V] [SI1-JUN20] | 3 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Kings County have been matched to an average of 0.8 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (288 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-124311536 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.