PanelCensus

PGE-INT-124111219

Clovis · Fresno County · California · Commercial

System size
39 kW
37.6 kW AC
Installed
2024
2024-02-20
Price / watt
$3.53/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTRINITY POWERAll their sites →
InstallerTrinity SolarAll their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSunPowerSPR-M460-COM90459.6 W
inverterChint Power Systems AmericaCPS SCA25KTL-DO/US-208 [208V] [SI1-JUN20]225 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-124111219 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-124111219 — solar installation details | PanelCensus · PanelCensus