PGE-INT-123940078
Jackson · Amador County · California · Commercial
System size
599 kW
589.6 kW AC
Installed
2024
2024-10-11
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Distributed Solar Development, LLC | All their sites → |
| Developer | D S D CONSTRUCTION | All their sites → |
| Installer | D S D CONSTRUCTION | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar | JAM72D30-545/MB | 1,170 | 545.1 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 8 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Amador County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (17 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-123940078 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.