PGE-INT-123926046
San Jose · Santa Clara County · California · Commercial
System size
26.2 kW
25.3 kW AC
Installed
2022
2022-10-26
Price / watt
$30.48/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SUN FIRST! INC | All their sites → |
| Installer | SUN FIRST! INC | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SolarEdge Technologies Ltd. | SE14.4KUS (208V) [SI1-RPP] | 2 | 14.51 kW |
| inverter | SolarEdge Technologies Ltd. | SE9KUS (208V) [SI1-RPP] | 2 | 8.96 kW |
| inverter | SolarEdge Technologies Ltd. | SE14.4KUS (208V) [SI1-RPP] | 2 | 14.51 kW |
| inverter | SolarEdge Technologies Ltd. | SE9KUS (208V) [SI1-RPP] | 2 | 8.96 kW |
Record cadg_PGE-INT-123926046 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.