PGE-INT-123630463
Lemoore · Kings County · California · Commercial
System size
115.8 kW
113.9 kW AC
Installed
2025
2025-04-29
Price / watt
$1.62/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | RENEWABLE SOLAR | All their sites → |
| Installer | RENEWABLE SOLAR | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Chint Solar (Zhejiang) Co., Ltd. | CHSM72M(DG)/F-BH-410 | 304 | 515 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 2 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Kings County have been matched to an average of 0.8 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (288 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-123630463 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.