PGE-INT-123605374
San Joaquin · Fresno County · California · Commercial
System size
175.6 kW
171.2 kW AC
Installed
2024
2024-02-08
Price / watt
$3.13/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Canadian Solar Inc. | CS3W-450MB-AG | 420 | 450.5 W |
| inverter | SMA America | STP 62-US-41 [480V][SI1-JUN20] | 3 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-123605374 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.