PGE-INT-123426015
Lemoore · Kings County · California · Commercial
System size
66.1 kW
64.4 kW AC
Installed
2024
2024-06-18
Price / watt
$3.01/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TRINITY POWER | All their sites → |
| Installer | Trinity Solar | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SunPower | SPR-E19-420-COM | 48 | 419.9 W |
| module | SunPower | SPR-P19-390-COM | 85 | 390.3 W |
| module | SunPower | SPR-X22-360-COM-MLSD | 51 | 359.9 W |
| inverter | SMA America | STP 50-US-41 [480V][SI1-JUN20] | 1 | — |
| inverter | SMA America | STP 33-US-41 [480V][SI1-JUN20] | 1 | 33.3 kW |
Site risk
Severe-weather exposure
Solar sites in Kings County have been matched to an average of 0.8 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (288 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-123426015 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.