PGE-INT-123208904
Colusa County · California · Commercial
System size
621.8 kW
612.5 kW AC
Installed
2024
2024-08-08
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CENERGY POWER | All their sites → |
| Installer | CENERGY POWER | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS6W-540MB-AG | 1,224 | 540.2 W |
| inverter | Yaskawa Solectria Solar | PVI 50TL-480 [480V] [SI1-JUN20] | 9 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Colusa County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (122 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-123208904 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.