PanelCensus

PGE-INT-123101787

Chowchilla · Madera County · California · Commercial

System size
583.5 kW
574.8 kW AC
Installed
2024
2024-04-02
Price / watt
$2.14/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleCSI Solar Co., Ltd.CS6W-540MB-AG1,010540.2 W
moduleCSI Solar Co., Ltd.CS6W-535MB-AG140535.1 W
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20]860 kW

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.1807, -120.3390 · map

Record cadg_PGE-INT-123101787 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-123101787 — solar installation details | PanelCensus · PanelCensus