PGE-INT-123070776
San Pablo · Contra Costa County · California · Commercial
System size
113 kW
111.1 kW AC
Installed
2024
2024-09-05
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | BlueFlame Energy | All their sites → |
| Developer | MESA ENERGY SYSTEMS INC | All their sites → |
| Installer | MESA ENERGY SYSTEMS INC | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO XL-G10.3/BFG 480 | 251 | 479.7 W |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-SB] | 2 | 50 kW |
Record cadg_PGE-INT-123070776 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.