PGE-INT-123033878
Orland · Glenn County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | LEDBETTER ELECTRIC INC | All their sites → |
| Installer | LEDBETTER ELECTRIC INC | All their sites → |
| Utility | Adapture Renewables, Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar Co., Ltd | JKM545M-72HL4-TV | 230 | 513 W |
| inverter | SolarEdge Technologies Ltd. | SE100KUS [480V][SI1-JUN20] | 1 | 33.3 kW |
Site risk
Severe-weather exposure
Solar sites in Glenn County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (198 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 39.6995, -122.1779 · map
Record cadg_PGE-INT-123033878 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.