PanelCensus

PGE-INT-122890213

Madera · Madera County · California · Commercial

System size
76.6 kW
74.7 kW AC
Installed
2024
2024-02-01
Price / watt
$3.25/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTurn Key Construction and Solar, Inc.All their sites →
InstallerTurn Key Construction and Solar, Inc.All their sites →
Utility / operatorSouthern California Edison Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q CELLSQ.PEAK DUO L-G8.3 430191429.9 W
inverterSMA AmericaSTP 50-US-41 [480V][SI1-JUN20]1—
inverterSMA AmericaSTP 33-US-41 [480V][SI1-JUN20]133.3 kW

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-122890213 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-122890213 — solar installation details | PanelCensus · PanelCensus