PGE-INT-122789073
Sanger · Fresno County · California · Commercial
System size
36.8 kW
35.5 kW AC
Installed
2022
2022-11-14
Price / watt
$3.52/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Installer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Altenergy Power System | YC1000-3-208 (208V) | 16 | — |
| inverter | SMA America | SB7.7-1SP-US-41 [240V][SI1-JUN20] | 3 | 7.68 kW |
| inverter | Altenergy Power System | YC1000-3-208 (208V) | 16 | — |
| inverter | SMA America | SB7.7-1SP-US-41 [240V][SI1-JUN20] | 3 | 7.68 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-122789073 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.