PanelCensus

PGE-INT-122607062

San Benito County · California · Utility-scale

System size
7,803.7 kW
7,770.3 kW AC
Installed
2024
2024-09-06
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerBloom EnergyAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleBloom EnergyES5-YASAAK1—
moduleBloom Energy Fuel CellES5-300US0601S-NASK10-014—
moduleTrina SolarTSM-335DEG6M.20(II)1,840334.9 W
moduleAuxin SolarAXN6M610B3204,114320 W
moduleBloom EnergyES5-EAXAAK6—
inverterSMA AmericaSTP 62-US-41 [480V][SI1-JUN20]8—
inverterYaskawa Solectria SolarPVI 60TL-480 [480V] [SI1-JUN20]1860 kW
inverterBloom EnergyINV-750-0HA [480V] [SI1-JUN20]21—

Record cadg_PGE-INT-122607062 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-122607062 — solar installation details | PanelCensus · PanelCensus