PGE-INT-122514454
Glen Ellen · Sonoma County · California · Commercial
System size
74.3 kW
73.2 kW AC
Installed
2024
2024-03-21
Price / watt
$2.19/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PURE POWER SOLUTIONS | All their sites → |
| Installer | PURE POWER SOLUTIONS | All their sites → |
| Utility | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Jinko Solar Co., Ltd | JKM400M-72HL-V | 202 | 366.3 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 1 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Sonoma County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (5,408 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-122514454 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.