PanelCensus

PGE-INT-122513074

Corcoran · Kings County · California · Commercial

System size
452.5 kW
445.9 kW AC
Installed
2025
2025-09-15
Price / watt
$0.62/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleCanadian Solar Inc.CS3W-450MS1,080450.5 W
inverterChint Power Systems AmericaCPS SCH125KTL-DO/US-600 [600V] [SI1-JUN20]3125 kW

Site risk

Severe-weather exposure

Solar sites in Kings County have been matched to an average of 0.8 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (288 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-122513074 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-122513074 — solar installation details | PanelCensus · PanelCensus