PGE-INT-122389823
El Dorado County · California · Utility-scale
System size
1,731.5 kW
2,206.5 kW AC
Installed
2025
2025-05-02
Price / watt
$3.73/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | Engie Services U.S. | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-FWVW] | 26 | 60 kW |
| inverter | Chint Power Systems America | CPS SCA36KTL-DO/US [480V] [SI1-JUN20] | 4 | 36 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20] | 12 | 50 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20] | 12 | 50 kW |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-FWVW] | 26 | 60 kW |
| inverter | Tesla Inc. | 1848844-XX-Y [4hr] [480V] [SI1-SB] + Site Controller 1471208-XX-Y [CRD-PCS NEM] | 1 | — |
| inverter | Tesla Inc. | 1848844-XX-Y [4hr] [480V] [SI1-SB] + Site Controller 1471208-XX-Y [CRD-PCS NEM] | 1 | — |
| inverter | Chint Power Systems America | CPS SCA36KTL-DO/US [480V] [SI1-JUN20] | 4 | 36 kW |
Site risk
Severe-weather exposure
Solar sites in El Dorado County have been matched to an average of 1.5 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (149 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-122389823 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.