PanelCensus

PGE-INT-122389823

El Dorado County · California · Utility-scale

System size
1,731.5 kW
2,206.5 kW AC
Installed
2025
2025-05-02
Price / watt
$3.73/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerEngie Services U.S.All their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 [480V] [SI1-FWVW]2660 kW
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US [480V] [SI1-JUN20]436 kW
inverterChint Power Systems AmericaCPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20]1250 kW
inverterChint Power Systems AmericaCPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20]1250 kW
inverterChint Power Systems AmericaCPS SCA60KTL-DO/US-480 [480V] [SI1-FWVW]2660 kW
inverterTesla Inc.1848844-XX-Y [4hr] [480V] [SI1-SB] + Site Controller 1471208-XX-Y [CRD-PCS NEM]1—
inverterTesla Inc.1848844-XX-Y [4hr] [480V] [SI1-SB] + Site Controller 1471208-XX-Y [CRD-PCS NEM]1—
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US [480V] [SI1-JUN20]436 kW

Site risk

Severe-weather exposure

Solar sites in El Dorado County have been matched to an average of 1.5 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (149 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-122389823 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-122389823 — solar installation details | PanelCensus · PanelCensus