PGE-INT-122118348
Corning · Tehama County · California · Commercial
System size
60.8 kW
60.3 kW AC
Installed
2024
2024-04-02
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Sunrun | All their sites → |
| Developer | SUNRUN INSTALLATION SERVICES INC | All their sites → |
| Installer | Sunrun | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar | JAM60S10-340/MR | 193 | 339.7 W |
| inverter | SolarEdge Technologies Ltd. | SE11400H-US [240V][SI1-JUN20] | 3 | 11.39 kW |
| inverter | SolarEdge Technologies Ltd. | SE7600H-US [240V][SI1-JUN20] | 2 | 7.62 kW |
Site risk
Severe-weather exposure
Solar sites in Tehama County have been matched to an average of 2.7 hail and 0.3 high-wind NOAA storm events.
Regional storm exposure by proximity (192 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-122118348 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.