PGE-INT-121785644
Parlier · Fresno County · California · Utility-scale
System size
1,024.7 kW
998.3 kW AC
Installed
2022
2022-05-11
Price / watt
$0.87/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Plant operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SMA America | STP 62-US-41 [480V][SI1-JUN20] | 5 | — |
| inverter | Advanced Energy Industries, Inc. | Solaron 333kW (3159000-XXXX) | 2 | — |
| inverter | Advanced Energy Industries | Solaron 333kW (3159000-XXXX) (480V) | 2 | — |
| inverter | Advanced Energy Industries | Solaron 333kW (3159000-XXXX) (480V) | 2 | — |
| inverter | SMA America | STP 62-US-41 [480V][SI1-JUN20] | 5 | — |
| inverter | Advanced Energy Industries, Inc. | Solaron 333kW (3159000-XXXX) | 2 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-121785644 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.