PGE-INT-120856990
Santa Clara · Santa Clara County · California · Commercial
System size
72.6 kW
71.3 kW AC
Installed
2022
2022-05-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BLACK & VEATCH CONSTRUCTION INC | All their sites → |
| Installer | BLACK & VEATCH CONSTRUCTION INC | All their sites → |
| Utility / operator | SCV Water | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Vietnam Sunergy Joint Stock Company | VSUN390-72BMH-DG | 199 | 390.2 W |
| module | Tesla Inc. | PowerPack 1134768-XX-Y [SI1-JUN20] [CRD PCS] | 3 | — |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20] | 1 | 50 kW |
| inverter | Tesla Inc. | PowerPack 1134768-XX-Y [SI1-JUN20] [CRD PCS] | 3 | — |
| inverter | Chint Power Systems America | CPS SCA25KTL-DO-R/US-480 [480V] [SI1-JUN20] | 1 | 25 kW |
Record cadg_PGE-INT-120856990 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.