PanelCensus

PGE-INT-120527951

Clovis · Fresno County · California · Commercial

System size
131 kW
127.7 kW AC
Installed
2021
2021-08-18
Price / watt
$1.58/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTRINITY POWERAll their sites →
InstallerTrinity SolarAll their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSunPowerSPR-P17-350-COM416350 W
inverterSMA AmericaSTP 50-US-41 [480V][SI1-JUN20]2—
inverterSMA AmericaSTP 33-US-41 [480V][SI1-JUN20]133.3 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-120527951 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-120527951 — solar installation details | PanelCensus · PanelCensus