PGE-INT-120526554
San Ramon · Contra Costa County · California · Utility-scale
System size
2,861.3 kW
2,785.8 kW AC
Installed
2025
2025-07-28
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Distributed Solar Development, LLC | All their sites → |
| Installer | D S D CONSTRUCTION | All their sites → |
| Plant operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 26 | 60 kW |
| inverter | Tesla Inc. | Megapack 1462965-XX-Y [480] [SI1-JUN20] | 16 | — |
| inverter | SatCon Power Systems Canada | PVS-500 (480 V) | 4 | — |
| inverter | SatCon Power Systems Canada | PVS-500 (480 V) | 4 | — |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20] | 2 | 50 kW |
| inverter | Bloom Energy | INV-570 | 45 | — |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 [480V] [SI1-JUN20] | 26 | 60 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-JUN20] | 2 | 50 kW |
| inverter | Tesla Inc. | Megapack 1462965-XX-Y [480] [SI1-JUN20] | 16 | — |
| inverter | Bloom Energy | INV-570 | 45 | — |
Record cadg_PGE-INT-120526554 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.