PGE-INT-119943292
Jolon · Monterey County · California · Utility-scale
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | Ameresco | All their sites → |
| Plant operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Siemens Solar Industries | 6SL3330-7TE41-0AA | 8 | — |
| inverter | Solectria Renewables | SGI 500-480 | 4 | — |
| inverter | ABB | PVS-175-TL-POWER-MODULE-1-US [800V] [SI1-JUN20] | 17 | 179.57 kW |
| inverter | ABB | PVS-175-TL-POWER-MODULE-1-US [800V] [SI1-JUN20] | 17 | 179.57 kW |
| inverter | Advanced Energy Industries, Inc. | Solaron 500kW (3159500-XXXX) | 16 | — |
| inverter | Solectria Renewables, LLC | SGI 500-480 (480V) | 2 | — |
| inverter | Advanced Energy Industries, Inc. | Solaron 500kW (3159500-XXXX) | 16 | — |
| inverter | Solectria Renewables | SGI 500-480 | 4 | — |
| inverter | Tesla Inc. | Megapack 1462965-XX-Y [480V, 2hr] [SI1-JUN20] | 36 | — |
| inverter | Solectria Renewables, LLC | SGI 500-480 (480V) | 2 | — |
| inverter | Tesla Inc. | Megapack 1462965-XX-Y [480V, 2hr] [SI1-JUN20] | 36 | — |
| inverter | Siemens Solar Industries | 6SL3330-7TE41-0AA | 8 | — |
Site risk
Severe-weather exposure
Solar sites in Monterey County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (406 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 36.0036, -121.2313 · map
Record cadg_PGE-INT-119943292 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.