PGE-INT-119914587
Calistoga · Napa County · California · Commercial
System size
49.8 kW
48.4 kW AC
Installed
2024
2024-08-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SEMPER SOLARIS CONSTRUCTION INC | All their sites → |
| Installer | SEMPER SOLARIS CONSTRUCTION INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SMA America | SB9000TL-US-12 | 2 | — |
| inverter | SMA America | SB5000TL-US-22 (240V) | 2 | — |
| inverter | SolarEdge Technologies Ltd. | SE7600H-US [240V][SI1-JUN20] | 2 | 7.62 kW |
| inverter | Fronius USA, LLC | IG Plus 10.0-240 | 4 | — |
| inverter | Tesla Inc. | AC Powerwall 2 1092170-XX-Y [240V] [SI1-JUN20] + Gateway 1118431-XX-X [CRD PCS] | 3 | — |
| inverter | SolarEdge Technologies Ltd. | SE7600H-US [240V][SI1-JUN20] | 2 | 7.62 kW |
| inverter | SMA America | SB9000TL-US-12 | 2 | — |
| inverter | Fronius USA, LLC | IG Plus 10.0-240 | 4 | — |
| inverter | SMA America | SB5000TL-US-22 (240V) | 2 | — |
| inverter | Tesla Inc. | AC Powerwall 2 1092170-XX-Y [240V] [SI1-JUN20] + Gateway 1118431-XX-X [CRD PCS] | 3 | — |
Site risk
Severe-weather exposure
Solar sites in Napa County have been matched to an average of 0 hail and 1.9 high-wind NOAA storm events.
Regional storm exposure by proximity (154 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-119914587 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.