PanelCensus

PGE-INT-119189482

Santa Maria · Santa Barbara County · California · Utility-scale

System size
1,289.3 kW
1,255.4 kW AC
Installed
2021
2021-08-10
Price / watt
$2.70/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerENABLE ENERGY INCAll their sites →
Plant operatorSouthern California Edison Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleChint Solar (Zhejiang) Co., LtdCHSM72M-HC-4103,384380.9 W
moduleTesla Inc.Megapack 1462965-XX-Y [480] [SI1-JUN20]10—
inverterTesla Inc.Megapack 1462965-XX-Y [480] [SI1-JUN20]10—
inverterSMA AmericaSTP 62-US-41 [480V] [SI1-FWVW]17—

Site risk

Severe-weather exposure

Solar sites in Santa Barbara County have been matched to an average of 0 hail and 1.5 high-wind NOAA storm events.

Regional storm exposure by proximity (196 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 34.8950, -120.5047 · map

Record cadg_PGE-INT-119189482 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-119189482 — solar installation details | PanelCensus · PanelCensus