PGE-INT-119070975
Placerville · El Dorado County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Brighton Energy Inc. | All their sites → |
| Developer | BRIGHTON SOLAR INC | All their sites → |
| Installer | BRIGHTON SOLAR INC | All their sites → |
| Utility / operator | SkyHigh 2 Solar | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Fronius International GmbH | Fronius Primo 8.2-1 208-240 [240V] [SI1-FWVW] | 2 | 8.2 kW |
| inverter | Fronius International GmbH | Fronius Primo 11.4-1 208-240 [240V] [SI1-FWVW] | 1 | 11.4 kW |
| inverter | Fronius International GmbH | Fronius Primo 8.2-1 208-240 [240V] [SI1-FWVW] | 2 | 8.2 kW |
| inverter | SMA AMERICA | SWR2500U-SBD | 10 | — |
| inverter | SMA AMERICA | SWR2500U-SBD | 10 | — |
| inverter | Fronius International GmbH | Fronius Primo 11.4-1 208-240 [240V] [SI1-FWVW] | 1 | 11.4 kW |
Site risk
Severe-weather exposure
Solar sites in El Dorado County have been matched to an average of 1.5 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (149 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 38.6993, -120.8286 · map
Record cadg_PGE-INT-119070975 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.