PGE-INT-119026127
Parlier · Fresno County · California · Commercial
System size
59.5 kW
57.4 kW AC
Installed
2021
2021-09-22
Price / watt
$1.34/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TRINITY POWER | All their sites → |
| Installer | Trinity Solar | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SunPower | SPR-P17-350-COM | 189 | 350 W |
| inverter | Fronius International GmbH | Fronius Primo 12.5-1 [240V] [SI1-FWVW] | 4 | 12.5 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-119026127 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.