PGE-INT-118192939
Williams · Colusa County · California · Commercial
System size
48.2 kW
46.4 kW AC
Installed
2020
2020-11-30
Price / watt
$2.07/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | NORTH STATE SOLAR ENERGY CONSTRUCTION | All their sites → |
| Installer | NORTH STATE SOLAR ENERGY CONSTRUCTION | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SolarWorld | SW 295 Mono | 180 | 266.7 W |
| inverter | Chilicon Power, LLC | CP-250E-60/72-208/240-MC4 [240V] [SI1-FWVW] | 180 | 0.29 kW |
Site risk
Severe-weather exposure
Solar sites in Colusa County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (122 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-118192939 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.