PanelCensus

PGE-INT-117975120

Gerber · Tehama County · California · Commercial

System size
237.6 kW
230.6 kW AC
Installed
2020
2020-06-22
Price / watt
$2.85/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterSolectria Renewables, LLCPVI60kW-480 (480V)1—
inverterSMA AmericaSTP 50-US-41 [480V] [SI1-FWVW]2—
inverterSMA AmericaSTP 62-US-41 [480V] [SI1-FWVW]1—
inverterSMA AmericaSTP 50-US-41 [480V] [SI1-FWVW]2—
inverterSolectria Renewables, LLCPVI60kW-4801—
inverterSMA AmericaSTP 62-US-41 [480V] [SI1-FWVW]1—
inverterSolectria Renewables, LLCPVI60kW-480 (480V)1—
inverterSolectria Renewables, LLCPVI60kW-4801—

Site risk

Severe-weather exposure

Solar sites in Tehama County have been matched to an average of 2.7 hail and 0.3 high-wind NOAA storm events.

Regional storm exposure by proximity (192 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-117975120 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-117975120 — solar installation details | PanelCensus · PanelCensus