PGE-INT-116852188
Santa Barbara County · California · Utility-scale
System size
2,917.2 kW
2,871.7 kW AC
Installed
2020
2020-09-10
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | BAP Power Corporation DBA Cenergy Power | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | UNITED RENEWABLE ENERGY | F6M365H4A | 8,708 | 365.2 W |
| module | Ingersoll Rand | MT250 | 1 | — |
| inverter | Sungrow Power Supply Co., Ltd. | SG125HV [600V] [SI1-FWVW] | 20 | 125 kW |
Site risk
Severe-weather exposure
Solar sites in Santa Barbara County have been matched to an average of 0 hail and 1.5 high-wind NOAA storm events.
Regional storm exposure by proximity (196 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-116852188 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.