PanelCensus

PGE-INT-115025409

Solano County · California · Utility-scale

System size
5,224.3 kW
5,143.8 kW AC
Installed
2023
2023-06-23
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
InstallerBloom EnergyAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterSolectria RenewablesSGI 750XTM6753.2 kW
inverterFronius USAFronius Symo 24.0-3 480 (480V)7424 kW
inverterBloom EnergyINV-654 [480V] [SI1-FWVW]6—
inverterSolectria RenewablesSGI 750XTM6753.2 kW
inverterBloom EnergyINV-654 [480V] [SI1-FWVW]6—
inverterFronius USAFronius Symo 24.0-3 480 (480V)7424 kW

Record cadg_PGE-INT-115025409 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.