PanelCensus

PGE-INT-115015388

Anderson · Shasta County · California · Commercial

System size
128.5 kW
125.1 kW AC
Installed
2019
2019-01-08
Price / watt
$1.05/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperHalcyon SolarAll their sites →
InstallerHalcyon SolarAll their sites →
UtilityPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterEnphase EnergyM215-60-2LL-S2X (240V)32—
inverterEnphase EnergyM215-60-2LL-S2X (240V)32—
inverterYaskawa Solectria SolarPVI 50TL-480 (480V) [SI1-RPP]150 kW
inverterSolectria RenewablesPVI75kW-2081—
inverterYaskawa Solectria SolarPVI 50TL-480 (480V) [SI1-RPP]150 kW
inverterEnphase EnergyM215-60-2LL-S2x32—
inverterSolectria RenewablesPVI75kW-208 (208V)1—
inverterSolectria RenewablesPVI75kW-2081—
inverterSolectria RenewablesPVI75kW-208 (208V)1—
inverterEnphase EnergyM215-60-2LL-S2x32—

Site risk

Severe-weather exposure

Solar sites in Shasta County have been matched to an average of 1.8 hail (1 severe) and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (65 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-115015388 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-115015388 — solar installation details · PanelCensus