PGE-INT-114879643
Alameda County · California · Commercial
System size
107.1 kW
105.3 kW AC
Installed
2019
2019-06-03
Price / watt
$3.62/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Synergy Power | All their sites → |
| Installer | Synergy Power | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SolarEdge Technologies Ltd. | SE10KUS (480) [SI1] | 1 | 9.85 kW |
| inverter | SolarEdge Technologies | SE10K (480V) | 1 | 9.85 kW |
| inverter | Ideal Power Inc | 30C [480V] | 1 | — |
| inverter | SolarEdge Technologies | SE10K (480V) | 1 | 9.85 kW |
| inverter | SolarEdge Technologies Ltd. | SE33.3KUS (480) [SI1] | 3 | 33.3 kW |
| inverter | SolarEdge Technologies Ltd. | SE10KUS (480) [SI1] | 1 | 9.85 kW |
| inverter | SolarEdge Technologies Ltd. | SE33.3KUS (480) [SI1] | 3 | 33.3 kW |
| inverter | SolarEdge Technologies | SE33.3KUS (480V) | 3 | 33.3 kW |
| inverter | SolarEdge Technologies | SE33.3KUS (480V) | 3 | 33.3 kW |
| inverter | Ideal Power Inc | 30C [480V] | 1 | — |
Record cadg_PGE-INT-114879643 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.