PGE-INT-114311649
Pleasant Grove · Sutter County · California · Commercial
System size
36.6 kW
35.8 kW AC
Installed
2018
2018-05-25
Price / watt
$2.03/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Sunworks | All their sites → |
| Installer | Sunworks | All their sites → |
| Utility | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | GCL System Integration Technology | GCL-P6/72325 | 124 | 324.9 W |
| inverter | Yaskawa Solectria Solar | PVI 36TL-480 (480V) [SI1] | 1 | 36 kW |
Site risk
Severe-weather exposure
Solar sites in Sutter County have been matched to an average of 1.7 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (82 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114311649 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.