PGE-INT-114275628
Selma · Fresno County · California · Commercial
System size
47.7 kW
46.3 kW AC
Installed
2018
2018-04-06
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Solar Symphony Construction | All their sites → |
| Developer | Solar Symphony Construction, Inc | All their sites → |
| Installer | Solar Symphony Construction, Inc | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries | HiS-S355RI | 148 | 350.1 W |
| inverter | SolarEdge Technologies Ltd. | SE14.4KUS (208) [SI1] | 3 | 14.51 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114275628 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.