PGE-INT-114258418
Rocklin · Placer County · California · Commercial
System size
34.7 kW
33.6 kW AC
Installed
2018
2018-06-15
Price / watt
$3.78/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | A-C Electric co | All their sites → |
| Installer | A-C Electric co | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries Green Energy Co. | HiS-S335RI | 114 | 350.1 W |
| inverter | SolarEdge Technologies Ltd. | SE10000A-US (208) [SI1] | 3 | 9.94 kW |
Site risk
Severe-weather exposure
Solar sites in Placer County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (221 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114258418 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.