PGE-INT-114211093
Plymouth · Amador County · California · Commercial
System size
124 kW
121.4 kW AC
Installed
2018
2018-04-06
Price / watt
$2.90/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Westcoast Solar Energy | All their sites → |
| Installer | Westcoast Solar Energy | All their sites → |
| Utility | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries | HIS-S335TI | 408 | 303.9 W |
| inverter | SMA America | STP30000TL-US-10 (480V) | 4 | 30 kW |
Site risk
Severe-weather exposure
Solar sites in Amador County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (17 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114211093 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.