PGE-INT-114209749
Kerman · Fresno County · California · Commercial
System size
428.2 kW
422.2 kW AC
Installed
2020
2020-06-16
Price / watt
$1.55/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | ImMODO Energy Services | All their sites → |
| Installer | ImMODO Energy Services | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Mundra Solar PV Ltd. | ASM-7-PERC-345 | 1,368 | 312.9 W |
| inverter | Sungrow Power Supply | SG60KU-M (480V) | 6 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114209749 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.