PGE-INT-114209280
Fresno · Fresno County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | AC Electric Company | All their sites → |
| Installer | AC Electric Company | All their sites → |
| Utility | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hyundai Heavy Industries | HiS-M265RG | 838 | 266.1 W |
| inverter | Chint Power Systems America | CPS SCA60KTL-DO/US-480 (480) [SI1] | 1 | 60 kW |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 (480) [SI1] | 3 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-114209280 from CADG · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.