PanelCensus

PGE-INT-114208250

Escalon · San Joaquin County · California · Commercial

System size
55.1 kW
54.3 kW AC
Installed
2018
2018-08-02
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTom Richards ElectricAll their sites →
InstallerTom Richards ElectricAll their sites →
UtilityA2B Development LLC dba Mars Energy DevelopmentAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleLG ElectronicsLG330N1C-A5180330.3 W
inverterSolectria RenewablesPVI 50TL-480 (480V)150 kW

Site risk

Severe-weather exposure

Solar sites in San Joaquin County have been matched to an average of 1 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (764 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.8567, -121.0173 · map

Record cadg_PGE-INT-114208250 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-114208250 — solar installation details