PGE-INT-114208186
Moraga · Contra Costa County · California · Commercial
System size
444.6 kW
435.4 kW AC
Installed
2017
2017-06-13
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | SolarCity | All their sites → |
| Developer | SolarCity Corporation | All their sites → |
| Installer | SolarCity (Tesla) | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | DynaPower | MPS100 | 2 | — |
| module | Trina Solar | TSM-310PD14 | 1,560 | 310.1 W |
| inverter | DynaPower | MPS100 | 2 | 98.86 kW |
| inverter | Solectria Renewables | PVI 28TL-480 (480V) | 13 | — |
Record cadg_PGE-INT-114208186 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.